Stages
STAGEArea
(SQ FT)
Length
(FT)
Width
(FT)
Height
(FT)
Pits/
Tanks
Silent AC/AudienceWireless InternetPoint LoadCAD
File
PDF
File
Stage Details
Stage 1
9,200
100'
92'
29'
N/A

Support rooms available

Support rooms available

Stage 3
12,320
154'
80'
27'
7,000 lbs.

Connected to Stage 4 - currently there is no interior elephant door in place.

Connected to Stage 4 - currently there is no interior elephant door in place.

Stage 4
10,626
154'
69'
27'
7,000 lbs.

Connected to Stage 3 - currently there is no interior elephant door in place.

Connected to Stage 3 - currently there is no interior elephant door in place.

Stage 5
8,896
139'
64'
23'
N/A
Stage 6
8,757
139'
63'
19'
7,000 lbs.
Stage 12
29,054
199'
146'
49'
7,000 lbs.

Additional Fire stage at 6,755 included

Additional Fire stage at 6,755 included

Stage 16
11,520
144'
80'
28'
7,000 lbs.

Inter-connecting door with Stage 17

Inter-connecting door with Stage 17

Stage 17
10,080
144'
70'
28'
7,000 lbs.

Inter-connecting door with Stage 16

Inter-connecting door with Stage 16

Stage 18
10,656
144'
74'
29'
7,000 lbs.
Stage 19
10,656
144'
74'
27'
N/A
Stage 20
10,656
144'
74'
27'
N/A
Stage 21
19,701
199'
99'
39'
4,000 lbs.

Formerly Stage 27

Formerly Stage 27

Stage 22
18,000
150'
120'
35'
N/A

Connecting elephant door between Stage 22 & 23. Support rooms available.

Connecting elephant door between Stage 22 & 23. Support rooms available.

Stage 23
18,000
150'
120'
35'
N/A

Connecting elephant door between Stage 22 & 23. Support rooms available.

Connecting elephant door between Stage 22 & 23. Support rooms available.

Stage 24 (New)
18,054
153'
118'
51'
N/A

Currently there is no wall separating STAGE 24 & 25

Central Air Conditioning

Currently there is no wall separating STAGE 24 & 25

Central Air Conditioning

Stage 25 (New)
18,054
153'
118'
51'
N/A

Currently there is no wall separating STAGE 24 & 25

Central Air Conditioning

Currently there is no wall separating STAGE 24 & 25

Central Air Conditioning

Stage 26 (New)
18,054
153'
118'
51'
N/A

Connecting elephant door between Stage 26 & 27. Support rooms available

Central Air Conditioning

Connecting elephant door between Stage 26 & 27. Support rooms available

Central Air Conditioning

Stage 27 (New)
18,054
153'
118'
51'
N/A

Connecting elephant door between Stage 26 & 27. Support rooms available.

Central Air Conditioning

Connecting elephant door between Stage 26 & 27. Support rooms available.

Central Air Conditioning

Stage 33
6,831
99'
69'
25'
N/A
Stage 34
6,831
99'
69'
25'
N/A
Stage 35
6,831
99'
69'
25'
N/A
Stage 36
6,831
99'
69'
25'
N/A
Stage 37
14,000
140'
100'
30'
7,000 lbs.
Stage 41
14,280
140'
102'
30'
N/A
Stage 42
14,280
140'
102'
30'
N/A
Stage 43
14,280
140'
102'
30'
N/A
Stage 44
14,280
140'
102'
30'
7,000 lbs.
Stage 747
8,201
139'
59'
21'
N/A
1220 Digital Stage
5,800

Space is made up of 2 areas - Main Room and Lounge.

Space is made up of 2 areas - Main Room and Lounge.

Studio K Digital Studio
1,000

18x10 Green Screen Cyc Wall

Connectivity to Fiber/Control rooms if needd

Unitstrut grid

18x10 Green Screen Cyc Wall

Connectivity to Fiber/Control rooms if needd

Unitstrut grid

Follow us on Social Media
02.23.19
Promo shoot set up for last season’s The Voice.
View Comments
02.22.19
In honor of this weekend’s Oscars, we visited the “Art of Motion Picture Costume Design” exhibit at the FIDM Museum. NBCUniversal Archives & Collections provided #costumes from “First Man” and “Mary Queen of Scots”. Check out our Insta-story to see the displays! #archives #costume #moviehistory #firstman #maryqueenofscots #museum
View Comments
02.20.19
The #universalmonsters mural came out amazing! Swipe
View Comments
02.19.19
COLONIAL STREET
View Comments
02.18.19
The #prop department has #portraits of past presidents to decorate those White House sets.
View Comments
02.18.19
Been waiting a couple of months since this special was filmed on the Lot. Can’t wait to watch tonight at 9/8c on @nbc!
View Comments
02.16.19
This weather reminds us of the holiday season. A holiday #flashback at a winter wonderland #event in This past December.
View Comments
02.14.19
Another storm is coming...
View Comments
Stages and Backlot Contact Information
Submit
THANK YOU!
Thank you for your submission. We will be in touch shortly.